Language:  

 BECOME PART OF EUROPEAN RESEARCH IN IST WORLD !
Find:
AddThis Social Bookmark Button
HELP | ABOUT
 
 Query Definition:
 
   
   Selected Dataset:
 
 
 
   Search Method:
  » Basic Search
 
  » Categorical Search
» IST World » CORDIS FP5 cleaned » Projects » 1 Result » Details View
A biomass gasification combined heat and power [chp] sheme for the production of up to 100 kwe and 250 kwth.
Start: 7/19/2001
End: 4/18/2002
Homepage: http://cordis.europa.eu/data/PROJ_FP5/ACTIONeqDndSESSIONeq112362005919ndDOCeq20ndTBLeqEN_PROJ.htm

Project Status History
completed7/19/2001
 
Abstract
Biomass Eng. Ltd.'s objective is to demonstrate economically viable small-scale biomass gasification CHP system. Current small-scale systems are expensive and gas clean up is expensive, due to high levels of tars and particulates. Biomass Engineering Ltd., is seeking partners to be involved in a project with the following deliverables: - Optimise a biomass gasification system with high availability (above 95%) with improved heat recovery and power generation using the best available gas engine and filtration with detailed process integration. - Optimise a filtration system solely to remove particulates. Biomass Engineering Ltd. has demonstrated a tar content in the raw gas of less than 12 mg/Nm3, particulates 47 mg/Nm3. - Minimise emissions and comply with EU legislation by using by-products within the gasification system. Char will be used for wastewater cleaning. Treated water will be discharged to foul sewer and residual has returned to the land.

 
 Organisations
Advanced Analysis ...
 
 Results  
 Competence  

 
People
 
 Results  
   
   
   
   
   






 
data sets 
CORDIS FP5+FP6
CORDIS FP5
CORDIS FP5 cleaned
European Research
 Analytic Tools:
» Result List
» Details View
 
 Advanced Tools:
» Collaboration Diagram
» Competence Diagram
 
 Experimental Tools: 
» Collaboration Trends
» Competence Trends
» Consortia Prediction
Please send corrections and pointers to missing information to feedback@ist-world.org.